Wood Deck Installation
The hold down force for each spigot is 2,500 lbs. We suggest using 3/8” diameter x 3.5” ASTM A307 Grade A
structural bolts as they have sufficient capacity to resist this force. Use with flat washer to fasten spigots to wood
deck. ASTM A307 Grade A structural bolts and washer should be cadmium plated or stainless steel so they do not rust.
Lag bolts must be installed into rim joists or lam beam or properly blocked sub structure. If lag bolts are attached to
deck planks only failure will occur as a result of improper installation. Improper installation
and failure may result in injuries or death. Do it once and do it right!
INSTALLATION WITH
TWO OR THREE SPIGOTS
2 SPIGOT INSTALLATION
3 SPIGOT INSTALLATION
Will Withstand Hurricane Force Winds
Will Withstand Wind Gusts up to 115 MPH
Installation of Spigots Using Wood Planks
Installation of CVGR Spigots to wood planks are fine as long as you use three
2” x10”s. You must tie the three plies of wood together with (4) #8 4” wood
screws*, located 3” from spigot screws.
More installation information including additional fastener product recommendation
listed on next page. Product Specifications included as well.
*Or use four RSS Rugged Structural Screws (5/16x4) by GRK Fasteners shown at top of next page.