Installation Guide

3
CABLE:
In your kit you have enough marine grade 316
stainless steel cable to complete your project with
approximately 10% extra. CityPost wants to make
sure that if you decide to make a last-minute change
to your layout or for some reason you made a
mistake you have plenty of materials to complete
your project without any delays.
CABLE END-FITTINGS:
(22) For every run of 36” railing
(26) For every run of 42” railing
There are (11) cables holes in a 36” post and (13)
holes in a 42” post so we make sure that you have
plenty of materials to start and stop your railing at the
beginning and end of every run. All cable end-fittings
are manufactured out of marine
grade 316 stainless steel. EXAMPLE: if your project
has (5) individual runs of railing you will have
received (5) bags of fittings for a total of 110.
BEVELED WASHERS
(stairs only):
Beveled washers are used to hold the cable end-
fittings at the proper angle to ensure your cable
maintains the desired straight line going down the
stairs. These beveled washers are shipped in bags of
(22) for 36stair railing runs and bags of (26) for 42”
stair railing runs. Just like the cable end-fittings, the
beveled washers are manufactured out of marine-
grade 316 stainless steel.
TOOLS:
If purchased, your kit we will include a stainless-steel
cable cutter & a hand crimping tool that will allow you
to secure the stainless-steel end-fittings onto the
stainless-steel cable. NOTE: All orders purcha
sed
directly from CityPost have tools included for free.
Kits ordered through online retailers do not include
tools.
TOP RAIL:
If you received top rail from CityPost you will have received (4) 1” #12 self-tapping sheet metal screws per post
for installation (the top rail bracket has 4 points of connection). Each of your CityPost transition sleeves which
are used to hide miter cuts and strengthen the corners were shipped with (4) ½ #8 self-tapping sheet metal
screws for installation.