User's Manual

176
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines: 6FZ - RFN 2003 #
Setting the timing (continued).
Turn the tensioner roller (8), using tool [5a] to go beyond slot «b».
P
osition the tool [5b] to lock the index «a» and remove the tool [5a].
Reposition the timing belt (7) on the crankshaft pulley.
Hold the timing belt (7) in place using tool [3].
Fit the timing belt (7) in place, respecting the f
ollowing order:
- Guide roller (10).
- Inlet camshaft pulley (6).
- Exhaust camshaft pulle
y (5).
- Coolant pump (11).
- T
ensioner roller (8).
NOTE: Make so that the belt (7) is as flush as possible with the exterior face of the various
pinions and rollers
.
Remove:
- Tool [3].
- Tool [1] from the exhaust camshaft pulley.
- T
ool [5b] from the tensioner roller (8).
Refit:
- The lower timing cover (4) (by moving the engine).
- The crankshaft pulley (2).
Screw (3) of the crankshaft pulle
y
Tighten screw (3) to 4 ± 0,4 m.daN, then angular tighten to 53° ± 4°, tool [4].
B1EP1BCD B1EP1BDC
XSARA - XSARA PICASSO