Installation manual

4-3
Installing the Head and Top Cap
Step 1 cont’d: Check Boxes for Correct Contents
Head assembly
The station’s head assembly ships in a box containing:
• Head assembly
• Rubber plugs (4) - two of these are spares.
• L-wrench (attached with a security tag on the side of
the head assembly)
• Spare activation label (a duplicate label is attached
to the head assembly)
IMPORTANT: Keep the spare activation label
for future reference. It contains critical information
that is needed to document the radio groups when
preparing the station for activation on ChargePoint
(see page 4-15).
For gateway stations, a Network Enablement Kit is also
included:
• SIM card
• Installation instructions
IMPORTANT: Locate and retain the envelope
containing the Network Enablement Kit, located
under the head assembly in the shipping box. It
contains critical components that allow the gateway
station to communicate on the ChargePoint network
(see installation instructions on page 4-4).
An activation label is attached to the
head assembly. This duplicate label is
provided to simplify the step of
documenting the radio groups. It
includes important information
needed to activate the station on
ChargePoint.
GATEWAY STATIONS ONLY:
The shipping box also
includes an envelope
containing the Network
Enablement Kit.
SIM card
Installation
instructions
L-wrench