Installation manual

4-6
ChargePoint® Charging Stations
TO INSTALL A SCREW TYPE TOP CAP (to install a snap type top cap, see the previous page)
a) Place the top cap over the head assembly as shown, ensuring correct alignment.
b) Using a Phillips screwdriver, secure the top cap to the head assembly by inserting the two supplied screws into the
back of the top cap and tightening to 20 in-lbs (2.3 Nm).
Ensure correct alignment
so the top cap slides into
its secured position:
The small hole in each
of the two protruding
tabs on the bottom of
the top assembly must
slide and then snap
over the corresponding
nodule on the side of
the head assembly.
Tab
Tab
Nodule
Nodule