Single and Two Tank Electric Booster Assembly - 40°F/70°F Rise
ATTENTION:
Install the highest Kw rated element in the top and the lowest rated
element in the corner closest to Item 9 in the illustration above.
Item 6 may be located on the opposite side of the booster.
98