Instructions / Assembly
Table Of Contents
- ENGLISH
- BILT Intelligent Instructions
- Installation Manual
- Contents
- Safety Symbol and Signal Word Review
- Unattended Operation
- Preparation
- Assembly
- Installation
- STEP 1 Determine the Header Bracket Location
- STEP 2 Install the Header Bracket
- STEP 3 Attach the Rail to the Header Bracket
- STEP 4 Position the Garage Door Opener
- STEP 5 Hang the Garage Door Opener
- STEP 6 Install the Light Bulbs
- STEP 7 Attach the Emergency Release Rope and Handle
- STEP 8 Install the Door Bracket
- STEP 9 Connect the Door Arm to the Trolley
- STEP 10 Install the Door Control
- STEP 11 Wire the Door Control to the Garage Door Opener
- STEP 12 Attach the Warning Labels
- STEP 13 Install the Protector System®
- STEP 14 Wire the Safety Reversing Sensors
- STEP 15 Connect Power
- STEP 16 Align the Safety Reversing Sensors
- Adjustments
- Battery Backup
- myQ® App Control
- Operation
- Maintenance
- Troubleshooting
- Warranty
- Automatic Garage Door Opener Safety & Maintenance Guide
- Repair Parts
- SPANISH
Lag Screw 5/16”-9x1-5/8”
HARDWARE
16
Wall Mounting
Holes
UP
Optional Mounting
Holes
Ceiling Mounting
Holes
UP
Highest Pointof
GarageDoor
Travel
6” (15 cm)
Maximum
Door Spring
Horizontal
Line
Header Wall
2x4
Structural
Support
Header
Bracket
Garage Door
Vertical
Centerline of
Garage Door
Header
Bracket
Garage Door
Lag
Screw
Door
Spring
Finished Ceiling
Vertical
Centerline of
Garage Door
Header Wall
Lag Screw
Installation
STEP 2 Install the Header Bracket
You can attach the header bracket either to the wall above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular requirements. Do not install the header bracket over
drywall.Ifinstallingintomasonry,useconcreteanchors(notprovided).
OPTION A - WALL INSTALLATION
1. Center the bracket on the vertical center line with the bottom edge of the bracket on the horizontal line as
shown (with the arrow pointing toward the ceiling).
2. Mark the vertical set of bracket holes. Drill 3/16” pilot holes and fasten the bracket securely to a
structuralsupport with the hardware provided.
OPTION B - CEILING INSTALLATION
1. Extend the vertical centerline onto the ceiling as shown.
2. Center the bracket on the vertical mark, no more than 6” (15 cm) from the wall. Make sure the arrow is
pointing away from the wall. The bracket can be mounted ush against the ceiling when clearance is
minimal.
3. Mark the side holes. Drill 3/16” pilot holes and fasten bracket securely to a structural support with the
hardware provided.
WALL INSTALLATION
CEILING INSTALLATION