Installation Guide
Questions? (888) 788-2254
www.CaliFloors.com
Cali Vinyl
®
Pro with Mute Step
®
Flooring Installation Guide
Page 11
Installation
Installing the Final Row:
After Install/Floor Care Maintenance:
• For Cleaning, we recommend dry or damp mopping as needed using Bona Stone Tile & Laminate cleaner or similar.
• Do not use anything abrasive or harsh chemicals to clean the floor. Never use any of the following products on your
floor: ammonia-based cleaners, mineral spirits, acrylic finishes, wax-based products, detergents, bleach, polishes, oil
soap, abrasive cleaning soaps, acidic materials such as vinegar.
• Never apply wax treatments or top coats to the floor.
• Do not drag furniture across the floor, use felt pads on chair and furniture legs.
• Keep pet’s nails trimmed to avoid excess scratching.
• Sweep or vacuum the floor regularly to remove loose dirt. Do NOT use vacuums that use a beater bar or turn beater bar
off.
• Place quality walk-off mats at all entrances to retain tracked in dirt, grit and moisture, never use latex or rubber backed
mats as they can permanently stain the floor.
• Area rugs are also recommended in front of kitchen sinks and in high traffic areas.
• Although the Cali Vinyl Plank Flooring is water proof, it is still a best practice to avoid excessive moisture on the floor.
Therefore, we recommend soaking up spills immediately using a dry towel or dry mop.
• Limit direct sunlight on floor by using curtains and blinds in areas that are exposed to high UV rays.
• Heating units or non-insulated ductwork close to the flooring or subfloor may cause “hot spots” which must be
eliminated prior to installation.
• Heavy furniture (500+ lbs.) may obstruct the free, natural movement of a floated floor. Restricting this movement in
certain areas can lead to problems such as buckling or separation when the floor experiences natural expansion and/or
contraction.
1. The last row may need to be cut lengthwise (ripped). Make sure ripped piece is at least 1/3 the size of the overall width of the
plank. Cut the last board to size. Use pull bar and hammer to engage the length of the last plank.