Installation Manual

WARNING
TURN OFF THE CIRCUIT BREAKER
SUPPLYING POWER TO THE HEATER
BEFORE INSTALLING THE LOAD
TRANSFER SWITCH (LTF). LOCK,
TAPE, OR TAG THE CIRCUIT BREAKER
PANEL DOOR OR FUSE BOX. FAILURE
TO DO SO COULD RESULT IN SERIOUS
ELECTRICAL SHOCK, BURNS, OR
POSSIBLE FATALITY!
When using electrical appliances, basic precautions should always be followed to reduce the risk of re, electric shock, and injury to
persons, including the following:
HEATER OUTLET
Load Transfer Plate LTF-240
Installation Instructions
http://cadetheat.com/products/baseboard-heaters/baseboard
SAVE THESE INSTRUCTIONS
cadetheat.com Tel: 855.CADET.US P.O. Box 1675 Vancouver, WA 98668-1675
©2016 Cadet Printed in U.S.A. 11/16 #720031
Features & Benets
Conveniently uses one circuit to operate either a baseboard
heater or A/C unit.
TOOLS REQUIRED
• #2 Phillips Screwdriver
• Wire Connectors (not included)
IMPORTANT INSTRUCTIONS
1. Read all instructions before using this heater and load transfer
plate.
2. All electrical work and materials must comply with the National
Electric Code (NEC), the Occupational Safety and Health Act
(OSHA), and all state and local codes.
3. If you need to install a new circuit or need additional wiring
information, consult a qualied electrician.
4. Check that the circuit breaker and wiring is for a 20 amp rating.
5. The LTF-240 is only approved for installation on CADET
brand baseboards.

Summary of content (2 pages)