Installation and Operation Manual
-
PUMP AND
:L
CHANNEL BLOCK
7
3''
--q
DRAW UP
-3
REQ'D
BLOCK
-
PUMP AND
HYDRAULIC DRAW-UP
OF
SECTIONS
Fig.
12
ROD CLAMP
RAM
SET
@
HYDROSTATIC TEST
-
After the boiler sections
C. Testing pressure should be
at
least
10
pounds but
should not exceed
50
pounds.
have been assembled, it is essential that the boiler be hy-
drostatically tested before platework, jacket, or piping is
installed. D.
Tankless Heater Installation
If boiler is ordered with tankless heaters, install heat-
ers with the gaskets provided. Table
I1
on page
25
gives the maximum number of heater permissible per
assemblage and the heater ratings.
E.
Plug all boiler tappings and fill entirely
with
cold
water. To protect and safeguard the accuracy of steam
or water gauge supplied, DO NOT INSTALL GAUGE
UNTIL AFTER TESTING OF BOILER.
EXAMINE BOILER CAREFULLY, INSIDE AND
OUTSIDE, to insure against leaks from cocked nipples
or through concealed breakage caused in shipping and
handling. This precauti'on is for your protection and
will simplify handling of necessary replacements and
adjustment claims.
After making certain that there
are no leaks, drain
boiler and remove plugs for boiler trim and other con-
nections.