BREW EXPRESS ® INSTALLAT ION GUIDE model # BE-104 & BE-110 Note - BE-104R shown in illustrations. E: T O N ress.com. p T x E N w e A r T .B IMPOR l video online at www rization. structiona hout autho it in r w u e o s a e h e s rc u 3 formation to place of p t c u d 66.268.
Contents 1. Safety 1-2 2. Getting Started 3 3. Hardware/Tools 4 4. Specification and Requirements 5-6 5. Location (area of Installation) 7 6. Water Installation 8 7. Power Installation 9 8. Brewer Installation 9.
Safety IMPORTANT SAFEGUARDS When using electrical appliances, basic safety precautions should always be followed, including the following: 1. Read all Instructions. 2. Do not touch hot surfaces. Use handles or knobs. 3. The voltage and frequency of the supply connections should conform to those of the rating label. 4. Close supervision is necessary when any appliance is used by or near children. 5. Allow to cool before putting on or taking off parts, and before cleaning the appliance. 6.
Safety IMPORTANT: Read and follow instructions carefully before installing your BREW EXPRESS in-the-wall COFFEE SYSTEM. FOR BEST RESULTS, IT IS ADVISED THAT YOU HIRE A QUALIFIED PROFESSIONAL. Always turn off all power at main electrical panel before attempting to install BREW EXPRESS. Improper electrical wiring could cause a fire hazard. All wiring MUST be performed in accordance with local electrical codes. Installation must be performed by a qualified electrician, or equivalent.
Getting Started IMPORTANT: Read and follow instructions carefully before installing your BREW EXPRESS in-the-wall COFFEE SYSTEM. For best results, it is advised that you hire a qualified professional. Getting Started 1. Carefully unpack BREW EXPRESS from gift box. 2. Remove carafe and brew basket from brewing unit. If brewer includes carafe lock, press on lever to remove carafe. 3. Remove hardware kit from inside brew basket. 4. Remove mounting screws from behind carafe and brew basket.
Hardware/Tools Hardware BREW EXPRESS comes supplied with the following items to ensure a successful installation. Check to be certain all items have been included with your brewer.
Specifications and Requirements BE-104 SPECIFICATIONS: (Specs for the BE-110 are on page 6) Read and follow instructions carefully before installing your BREW EXPRESS in-the-wall COFFEE SYSTEM. For best results, it is advised that you hire a qualified professional. 1. Overall Dimensions (Finished Unit with Rough-in-Box) approximately 9.9” x 11.8” (see below). 2. Dimensions for Rough-in-Box (Mounting Structure) approximately 8.5” x 10.1” x 4”. 3. Electrical Requirements 120VAC, 60HZ. (1400 watts). 4.
Specifications and Requirements BE-110 SPECIFICATIONS: (Specs for the BE-104 are on page 5) Read and follow instructions carefully before installing your BREW EXPRESS in-the-wall COFFEE SYSTEM. For best results, it is advised that you hire a qualified professional. 1. Overall Dimensions (Finished Unit with Rough-in-Box) approximately 12 1/4” X 13 3/8” (see below). 2. Dimensions for Rough-in-Box (Mounting Structure) approximately 11.5” X 11.5”. 3. Electrical Requirements 120VAC, 60HZ. (1400 watts). 4.
Location (Area of Installation) The BREW EXPRESS can be installed in most places where power and water are supplied. If only power is available, you may consider using a water bottle and pump. The most common locations are the kitchen, master bathroom or office. Installation inside an exterior wall is not recommended due to risk of water freezing. See warranty section for additional information. NOTE: It is important to check stud width and location for proper fit.
Water Installation Always turn off water supply at source. It is strongly advised you consult a qualified professional plumber when attempting to install the BREW EXPRESS in-the-wall COFFEE SYSTEM. It is important to make sure there are no conflicts or obstructions in the wall cavity such as plumbing or electrical wires. If in doubt, contact a qualified professional. DO NOT ATTEMPT INSTALLATION.
Power Installation Always turn off power supply at main electrical panel before attempting any electrical installation. Local electrical codes vary. All electrical installation must be done in accordance with local codes. Installation must be performed by a qualified electrician, or equivalent. IMPORTANT: Installation must be performed by a qualified electrician, or equivalent. The BREW EXPRESS can be installed in most places where power and water are supplied.
Brewer Installation IMPORTANT: If installing unit PRIOR to cabinets, it is strongly advised to consult with cabinet maker and building contractor for exact height of counter top due to the various thicknesses of counter tops (tile laminate, granite, etc). For best results cut hole and install unit AFTER cabinets are installed. A. Installing BREW EXPRESS on Counter It is best to install the unit so the bottom edge is just above the counter top.
Brewer Installation Installation of Rough-In-Box Figure 1 1. Locate wall studs adjacent to the desired location. Place template on wall as shown. Outside edge of slots in template should be even with left or right side of stud edge. The slots in the template designate the area to be cut. Outside edge of template is equivalent to brewer size . See figure 1. Figure 2 2. Use a utility knife to carefully cut inside the penciled outline area. Start with the stud side and work outward. DO NOT USE A SAW.
Brewer Installation 4. Place rough-in-box on a towel or cardboard to protect counter surface. Bring power supply wire from source to cut opening as shown in Figure 4. Minimum 12-2 wire required. Be sure to have an additional length of approximately 18” at rough-in-box opening for installation of box. Remove power panel cover. Install strain relief (not supplied) in hole. Run power supply wire through strain relief and secure power supply wire (See Supply Detail, page 11).
Brewer Installation 6. After sheet rock screws are in place, bend tabs to finish securing rough-in box to wall. See figures 6 and 7. Use pliers (if needed) to bend/crimp tabs firmly to wall. Gently slide excess water line back through grommet into wall cavity leaving top of connector a maximum of 3” above bottom of rough-in box. Carefully install power panel cover. All electrical wires and connections MUST be tucked completely inside POWER PANEL COVER, without exposing bare wiring inside rough-in box.
Brewer Installation 8. The male quick connector has a built in valve so water can be turned on prior to connection to coffee maker. Place unit on a towel or cardboard to protect counter surface. Place BREW EXPRESS directly in front of rough-in box. Connect brewer to water supply using quick connectors. (See Quick Connect Detail). Snap connectors together firmly. Turn on water, check for leaks prior to final installation of BREW EXPRESS.
brewer testing Testing Once BREW EXPRESS has been installed into the rough-in-box it must be tested to ensure proper operation. 1. Turn on electrical power and power switch (located on top of brewer). The brew button icon should be illuminated. If the button icon is not illuminated, refer to the troubleshooting section of this manual. 2. Turn on water supply to BREW EXPRESS. There should be no leaks in the water connections.
www.brewexpress.com for customer service or technical service please call (866)-268-5953 Printed in CHINA.