Installation Sheet

28
Powder Coated & Stainless Steel Restroom Partitions, Floor-Mounted with Overhead Brace Series 400 Installation
3/21/2018 Bradley • HDWT-INSTR-009 Rev K; ECN 17-14-007
Before installing the urinal screen components, determine the correct location for your application.
Draw a plumb line on the wall to represent the urinal screen
centerline. Measure from the highest point in the room and place
a mark on the urinal screen centerline at dimension "A" for the
respective urinal screen height (see table below).
A
Insert plastic anchors in all holes and secure bracket to the wall
with the #14 x 2" stainless screws provided.
C
Place the bottom of the bracket on the mark and center the
opening on the urinal screen centerline. Using the bracket as
a template, mark the hole locations on the wall. Remove the
bracket and drill a Ø5/16" hole (minimum 2" [51mm] deep) at
each hole location.
B
11a
Urinal Screens with Continuous Stainless Steel Brackets (Optional)
Using the bracket as a template, drill Ø3/16" holes through the
urinal screen at each bracket hole. Secure the urinal screen to
the bracket with the #14 x 5/8" stainless screws provided.
E
Place the urinal screen at dimension "B" for the respective
urinal screen height (see table on right) and insert it into the wall
bracket until a 1" (25mm) gap between the wall and urinal screen
is established.
D
"A"
floor
"B"
Urinal Plumb Line
Dim "A" Dim "B"
42" Urinal Screen 18-1/2" (470mm) 18" (457mm)
48" Urinal Screen 12-1/2" (318mm) 12" (305mm)
Brackets are used as templates, but since the hole patterns may be different, the brackets
may not be interchangeable.