User Guide
35
Venting continued-
TABLE 7
2” (5.1 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating
# of Elbows
(excl. vent
term.)
Max Straight
Length ft (m)
Min straight
Length
ft (m)
(2) 90 Elbows with (1) 90
Elbow
1
20 (6.1)
5 (1.5)
(2) 90 Elbows with (1) 90
Elbow
2
15 (4.6)
5 (1.5)
(2) 90 Elbows with (1) 90
Elbow
3
10 (3.0)
5 (1.5)
TABLE 8
3” (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating (Reduce 4”
to 3”) (Reduce 10.1 cm to
7.6 cm)
# of Elbows
(excl. vent
term.)
Max straight
Length ft (m)
Min straight
Length
ft (m)
(2) 90 Elbows with (1) 90
Elbow
1
40 (12.2)
10 (3.1)
(2) 90 Elbows with (1) 90
Elbow
2
35 (10.7)
10 (3.1)
(2) 90 Elbows with (1) 90
Elbow
3
30 (9.1)
10 (3.1)
(2) 90 Elbows with (1) 90
Elbow
4
25 (7.6)
10 (3.1)
(2) 90 Elbows with (1) 90
Elbow
5
20 (6.1)
10 (3.1)
HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,500
FEET (762 m) ABOVE SEA LEVEL
The capacity of the induced draft blower declines with increasing altitude due to
a reduction in the air density. In order to assure safe and reliable performance
of the water heater, contact the supplier for high altitude kit.