Installation / Operation Instruction Manual

18
Venting continued-
Figure 9a
Through the Roof Venting (Vertical Venting Standard Terminals):
Cut the necessary holes through the roof and ceiling and install the vent connector as
shown in Figure 6. Make sure that the installation meets the local codes and/or The
National Fuel Gas Code ANSI Z223.1 (Latest Edition) or CGA/CAN B149 Installation
Code (latest edition).
It is acceptable to install a 90° elbow on IPEX concentric vent terminations use with this
power direct vent water heater (see Figure 9b). A short length of appropriate diameter
vent pipe should be used to transition from the vent terminal to the 90° elbow. Approved
venting materials along with primers and cements are listed at the beginning of this
venting section. When the 90° elbow is used the equivalent length of the elbow and
short length of vent pipe must be factored into the total vent/air intake pipe
determinations (see Tables 1 and 2 for appropriate vent connector lengths).
(B) DIMENSION
MIN
MAX
12 in (30.5 cm)
44 in (111.8 cm)
Figure 9b