Installation / Operation Instruction Manual

21
Venting continued-
THROUGH THE ROOF VENTING: (VERTICAL VENTING CONCENTRIC
VENT TERMINAL):
Cut the necessary holes through the roof and ceiling and install the vent
connector as shown in Figure 7. Make sure that the installation meets the local
codes and/or the National Fuel Gas Code ANSI Z223.1 (Latest Edition) or
CAN/CGA B149 installation code (latest edition). A condensate kit must be
installed when venting through the roof.
Figure 7
NOTE: For installations requiring both horizontal and vertical runs,
the following rule must be followed. Total length of straight pipe
(both horizontally and vertically) must not exceed the equivalent
length listed in these instructions. For the concentric vent terminal
the maximum vent length is reduced by 20 feet.
CAUTION
FOR VERTICAL INSTALLATIONS WITH CONCENTRIC VENT
TERMINAL, CONDENSATE KIT, P/N 239-45875-00, MUST BE USED.