Haiku Owner's Manual

5
40 mm
Ø 8 mm
(anchor bolt)
Ø 8 mm
(anchor hook)
80 mm
100 mm
BEFORE YOU START
Low Profi le Mount
Drill four Ø 8 mm holes in the pattern shown (Fig. 1). The hole depth should not
exceed 46 mm (Fig. 2).
Remove dust from holes. Insert anchor bolts into holes. Strike the heads of the
anchor bolts with a hammer, ensuring bolt sleeves are fl ush with ceiling surface.
Position mounting plate on anchor bolts. Ensure all anchor bolts are fully tightened
to expand and lock the anchors.
If required by local building and safety codes, install an anchor hook for the safety
cable. Drill an Ø8 mm hole for the anchor hook. The hole depth should not exceed
46 mm (Fig. 2). Remove dust from hole, and then insert the anchor hook and fully
tighten.
46 mm max
46 mm max
Fig. 2
Fig. 1