Replacement Part List

7
Attach Floor Frame Assembly
PL07
6 Do not fasten decking material at this time!
NOTE: FLOOR FRAME MUST BE LEVEL AND
SQUARE BEFORE PROCEEDING!
If you are using decking material, complete the floor
frame assembly for the storage building as shown in
the assembly instructions found in building carton.
Position floor frame assembly on base kit, equal
distance on the sides, front and rear. Disregard
statement in building instructions and anchor front
and rear floor frames at dimension shown to side
channels and side floor frames to cross channels
using bolts and nuts.
*
If you are using the base kit as a finished form to pour
concrete, see next page. Pour concrete first, then
attach the floor frame assembly using concrete an-
chor bolts, available at your local building supply
store.
RAMP MUST BE FASTENED TO FRONT FLOOR FRAMES
SO THAT HOLES AT 5/16" 0,8 CM ARE TOWARD THE
FRONT TO LINE UP WITH HOLES IN BASE KIT CHANNELS
AT 2" 5,1 CM DIM.
Model ES109
USE SLOT
2" 5,1 cm
2" 5, 1 cm
8x8 or 10x8 or 10x9
5/16"
0,8 cm
SIDES & REAR
2" 5,1 cm
NOTE: PICK UP COMPLETED KIT TO ATTACH
NUTS TO BOLTS AT THESE TWO LOCATIONS.
* If there are no anchor holes in floor frames, or they do not line up:
Assemble the base kit to match the floor frames, and drill 1/4" (6 mm)
dia. holes at the cross members for attachment with bolts and nuts
provided.