Installation Guide
6 - ck
English
WARNING: Carry out the installation in a “workmanlike” manner, strictly following the installation instructions and using
suitable tools. Always consult your local building department for code requirements that must be respected depending
on its destination of use (private, secondary, public…).
Beforestartingtheassemblyprocess,unpackallcomponentsofthestaircase.Laythemoutonalargesurfaceand
checkthequantityofallthepieces,byconsultingthetable(TAB.1:A=Code,B=Quantity).
FortheUSAonly:callthecustomersupportlineat1-888STAIRKT,shouldyouhaveanycaseofneed.
Preliminary Assembly
1.
ScrewthepartsD32andD33intothetreads(L02)(g.2).
2. Carefullymeasuretheoor-to-oorheightanddeterminetherequirednumberofspacers(D03)(TAB.2).
3. Assemblethespacers(D14,D03,D02)togetherinonepiece.Dothesameforthespacers(D04,D03,D02)
(g.1).
4. AssemblethepartsC63,C65,C66intothebaluster(C03)(g.3).
5. AssemblethepartsB72,B73,B74,B78intothelandingE03,withouttightening(g.7).
6. AssemblethebaseG03,B17andB46(g.1).
Assembly
7. Determineandmarkontheoorthecentreofthehole,thenpositionthebase(G03+B17+B46)(g.4).
8. Drillwith14mm(⁄
”
)drillbitandxthebase(G03+B17+B46)intotheoorbymeansofthepartsB13(g.1).
9. Screwthepole(G02)intothebase(G03+B17+B46)(g.1).
10.Insertthespacers(D14+D03+D02)(g.5).
11.Insertthebaseplatecover(D05-D12)(g.5).
12.Insertthersttread(L02)intothepole(G02).Thencontinuewiththeassembly,byaddingalternativelyone
spacer(D04+D03+D02)andonetread(L02).Atthisstagewesuggesttopositionthetreadsalternatelyoneto
therightandonetotheleft,inordertodistributetheweightinabalancedway(g.5).
13.Whenyoureachtheendofthepole(G02),screwthepartB47onit,thenaddthesecondpole(G02)and
continuewiththestairassembly(g.5).
14.Whenyoureachtheendofthepole(G02),screwonitthepartB46andthepartG01.(ScrewthepartG01,until
itsupperendsticksoutapproximately15cm(5⁄
”
)fromthestairheight(g.6).Continueaddingthetreads,
byusingthepartD01insertedintothespacers(D04+D03+D02).
15.Finallyaddthestairlanding(E03).FastenthepartsB05,B04andscrewthepartB03sufciently(g.1)but
keepinginmindthatthetreadsstillhavetoberotatedtotheirnalpositionandthatthepointsAandBofthe
landing(E03)havetouchtheoor(g.8).
Fitting of the Landing
16.
ScrewthepartB71intotheelementB74,makingitruntilltheend.InsertthepartsB75,B76,B75-inthis
order–andthenagaintheelementB71,withouttighteningtoohard(g.7).
17.ApproachthepartB76totheceiling.Determinetheposition,thendrillwith14mm(⁄
”
)drillbitandx
completelybyusingthepartB58(g.7).
18.ScrewthelowerpartB71tillthepointsA,BandCtouchtheoor(g.8).
19.BlocktheupperpartB71onthepartB76(g.7).
20.Finally,blockthepartB73(g.7).
Assembly of the Railing
21.
Spread-outthetreads(L02)fan-like,afterhavingchosentherotationdirection.Thestairisnowreadytouse.
22. Startingfromthelanding(E03),insertthelongerrailingbalusters(C03-H1190mm-46 ⁄
”
),thatbuildthe
connectionbetweenthetreads.FacethemwiththepartC63showingthepartwiththeholesturnedupwards
(g.10).TightenonlythepartB02ofthelowertread(g.2).
23. CheckverycarefullytheverticalpositionoftheinsertedbalustersC03.Thiscontrolisveryimportantforinsuring
thebestresults.