STEAM BATHROOM MODEL : WS-9090K Your best choice! No advanced advice will be submit before we change our design and size. The pictures may be a little different from the real products. Our company keep the final explanation right.
TECHNIQUE PARAMETER Voltage Frequency Water Volatge Self-clean system Power of steam generator Step 2 Step 1 Ac110 V 60H Z 0.1~0.2Mpa 2.65KW CONSTRUCTION SKETCH Pour into cleaning liquid from here Handrail Step 3 Step 4 Moveable shower Glass door Cleaning method: 1.Clean the steam engine regularly at least once by every 2weeks or after using 20 times. 2.Inject citric acid as main cleaning liquid,add 1.5L each time.
CONSTRUCTION SKETCH Packing list Packing 1 Packing 2 two pieces of glass body,two pieces of fixed glass door,two pieces of sliding glass door, two pieces of aluminum column , two pieces of U shaped plastic seal , four pieces of water resist strip. 1 11 12 one tray,one roof, two pieces of up and down bended aluminum column with eight pieces of wheels. 13 2 one piece of post,one pieces of steam pipe.
ATTENTION INSTALLATION SKETCH 2 1 7 0 ( 8 5.4″) 150 ″) (5.9 The socket of power and the socket of telephone Cold water pipe Hot water pipe 1800 (70.9″) 1250 (49.2″) 160 (6.3″) 32 7( 12 .9 ″) 32 7( 12 .9 ) ″ 92 0( ″ ) .9 12 7( 32 36 .2 ″ ) Other screws 32 7( M4x15 M4x25 12 .9 92 ″ ) 0( 36 .2 ″ ) Install the screw M6x25 Active chain wheel of glass SIZE:920x920x2170 mm 3 6 . 2″x36.2″x85. 4″ ILLUSTRATION OF INSTALLATION 1.
Attention: The machine must be fixed in the circuit which protected by creepage protectionand should be well-connected with the ground. Nontechnical people can not be fixed or removed at random. INSTALLATION PROCESS 1.Assembly of tray If the ground is not smooth,please adjust the nail under the tray to keep the balance of the tray and ground. STEP 1 6、Technical parameter Model Voltage Current KL-824 110V 25A Fan 3.
4. Assembly of fixed glass door. STEP 4 4X25 Active chain wheel of glass 5. Assembly of sliding door put the sliding door onto the up and down aluminum track to keep it balance. (1) The electrical pitch Press pitch can open the machine, the temperature is the room temperature.The time will show 30m. At the same time, it will open the ceiling lamp.Press again will close all the functions.
6. Install the glass door onto the tray Put the plastic pad onto the aluminum post of glass door,if the length of the plastic is not suitable for the aluminum post,you can cut it in suitable size,then put it on the tray,screw with bolts.
DRAWING OF WATER CONNECTION ELECTRIC CIRCUIT SKETCH nstructions : 1.You should install the water heater yourself. 2.As the“ ”“ ”from the picture,please make the connection according to the serial number v1,v2,etc.