Installation & Assembly
Page | 1
HIGH DENSITY RECYCLED POLYSTYRENE (RPS)
BASE MOULDINGS INSTALLATION
TOOLS:
• Measuring tape
• Fine tooth saw & Mitre box or
compound mitre box
• Pencil
• Safety goggles
• Safety mask
• Hammer or finishing nailer
• Putty knife
• Caulking gun
• Paint brushes
MATERIALS:
• Nails
• Recycled Polystyrene Panel
mouldings
• Heavy Duty construction adhesive
(Lock Tite Power Grab can be used)
• High quality all Acrylic latex based
paint
• Painter's All-Purpose Acrylic Latex
Caulk
• Clean cloth or sponge
• 220 grit sandpaper
SAFETY
Wear safety mask and goggles when cutting Recycled Polystyrene (RPS)
Base mouldings.
WALL AND CEILING PREPARATION
Prior to installing panel mouldings make sure walls are
• dust free
• dry
• grease free
If needed, lightly sand and wipe surface with a damp cloth.
WORKING CONDITIONS
Before installing Architectural Product’s Recycled Polystyrene Base mouldings,
make sure mouldings and adhesives are placed at room temperature 24 hours
before installation. This allows material to adjust to the temperature of the room
to avoid expansion or contraction.
The recommended room temperature to install mouldings is between 50° to 95°
Fahrenheit