Are you ready to start Living the Spa Life? Spa Pre Delivery Guide Need Assistance? 1-888-768-6772
Pre Delivery Guide Spa Delivery: Your spa delivery will arrive CURBSIDE at the specified delivery address. You will need to make prior arrangements for assistance in moving your spa into the desired spa location. You may also need to hire an electrician for certain electrical applications and connections. Most cities and counties require permits for exterior construction and electrical circuits.
Site Selection Before proceeding, please read the “Important Safety Instructions” at the beginning of the owner’s manual. 1. Electrical Connection. For 120V models, plug in to a 15A dedicated outlet and you are ready to enjoy. The electrical cord is 12' long so it needs to be close enough to plug directly into a 3 prong grounded outlet. Do not use an extension cord. For 240V models, Electrical installation must be completed by a qualified certified licensed electrician in compliance with all codes. 2.
Site Selection Provide a solid load-bearing site: ● ● ● ● The site must provide a solid foundation with a minimum load bearing capacity of 34 kg per 929 sq. cm (75 pounds per square foot). Concrete slabs and decks must be designed to support this weight. Do not select a site composed of individual unsupported bricks, blocks, or other materials which will shift unevenly and cause damage to your spas internal frame.
Electrical Requirements - 120V 15A ● ● ● Locate your spa so that the GFCI plug and cord will reach a dedicated 120 volt outlet, but not closer than 5 feet (1.5m). A dedicated outlet is one that does not have other electrical devices operating on the same circuit. This can be checked by turning off the circuit breaker that supplies the intended outlet and verifying the no other electrical devices no longer work, such as a refrigerator, dishwasher, washing machine, coffee maker, hair dryer, etc.
Electrical Requirements - 220V Upgrade Conversion ● 240V electrical connections must be completed by a Certified Licensed Electrician. ● A G.F.C.I. AND A DISCONNECT SWITCH ARE REQUIRED: The National Electrical Code requires that spas connected to 240 Volt circuits be equipped with a “G.F.C.I.” and Disconnect Switch. See National Electric Code Articles 680-12 and 680-42.
Congratulations. You are now ready to start Living the Spa Life. Welcome To The Family! Customer Service is here to serve you and ensure the best possible experience .