Instructions / Assembly

15
3. Point W - Waste water connection:
Tubing color: Black tubing. Connect the BLACK tubing from the RO to the Drain Saddle.
Fitting type: Plastic Compression nut fitting with built-in sleeve. No teflon tape needed.
Do Not add ”insert into Black tubing. Simply secure the drain line by tightening the
compression nut.
4. Point A - System water inlet (to Stage 1 prefilter) connection:
Tubing color: Red tubing. Connect the RED tubing from the Feed Water Valve to the RO’s stage -1
prefilter.
Fitting type: Quick Connect fitting See Fig 10A on Page 12. Simply push the Red tubing into the QC
fitting. No Inserts, Sleeves or Nuts are needed to secure the connection. No Teflon tape
needed here.
5. Point H - Stage-5 filtered water to faucet connection:
Tubing color: Clear tubing. Connect the CLEAR tubing from the faucet base stud to the Stage-5 filter’s
outflow end at point H. (See “Flow -->” arrow on the filter for flow direction.)
Fitting type: Quick Connect: Simply push the Clear tubing into the QC fitting. No Inserts, Sleeves or
Nuts are needed to secure the connection. No Teflon tape needed here.
6. Point G - Stage-5 filter’s T-fitting connection:
Tubing color: Yellow tubing. Connect the YELLOW tubing to Stage-5 filter’s T-fitting.
Fitting type: Quick Connect: Simply push the Yellow tubing into the QC fitting. No Inserts, Sleeves or
Nuts are needed to secure the connection. No Teflon tape needed here.
.
7. Point Y - Tank’s input & output connection:
Prepare tank: See Fig.12. Apply 6-8 wraps of Teflon tape to tank’s threaded Output stem on top of tank
(remove rubber cap if there is one). Screw tank Valve onto Output stem.
Tubing color: Yellow tubing. Connect the YELLOW tubing from Stage-5 T-fitting to the tank’s valve.
Fitting type: Quick-Connect fitting on ball valve. Simply push Yellow tubing into valve port.
Standard 4-gallon Tank Diagram:
Fig. 12
Tank Ball Valve
OFF Position ON Position