Lx ANASAZI ANZAC GLASS SHOWER DOOR INSTALL GUIDE DON’T WAIT! REGISTER NOW! Hooter your product within 90 eve to ensure your product ls recognized ge an scaffold porches ard ls eligible for warranty sage, Halt in the completed registry card (Pg.
o PRODUCT REGISTRATION + IMPORTANT: YOUR WARRANTY WILL NOT BE RECOGNIZED UNLESS AN ZL THIS CARD IS UNCOMPLICATED RETURNED OR ONLINE REGISTRATION IS COMPLETED To ensure that your warranty is registered and confirmed please do one of the following: 1. Register online at www.sweorp.comiregister. You will be asked to fill out the same information you would in the registration card. Registering online is fast, secure and ensures we receive your information. 2.
GETTING STARTED Notice: This assembly requires two people due io the weight of the glass doors. Professional Installers are highly recommended. 1. Carefully inspect all boxes and packages fo make sure no damage occurred during shipping. If you find a unit has been damaged or has a finishing defect, contact your local distributor within 3 business days of the delivery date. Note: After 3 business days, or if the product has been installed, we will NOT replace any damaged products free of charge. 2.
EBA Nd@aEBRAZOE NEO RDN PARTS LIST (2x) Door stopper (1%) Glass panel (1x) Top guard ral (24) Roller (1x) Glass panel (1x) Handle (2%) Glass bracket (24) Guide tall bracket (2x) Large anchor 38° (2x) Screw Semtex (1%) Allen keys 3mm, 4mm & 5mm (1x) Guide bock (2x) Bumper strip (1x) Threshold cover (1x) Threshold (5x) Screw ST4.
MEASUREMENTS 1. Take a precise measurement of the distance between the two completed walls. This distance Is labeled as “W" on the diagram. Refer to Figure 1 for details. 2. For your convenience, the Top Guide Rail (03) has been precept for shower models with a width Wall-to-wall openings with a width (W) equal to the size of the shower mode! does not require you to cut the Running Rail (03). Simply continue to Step 3.
GLASS BRACKETS 3. Use the Grass Brackets (07) to attach the Upper Guide Rail (03) to the Stationary Glass (02). Tighten the set with screws. Place the Door Stoppers {01) on each end of the Top Guide Rail (03) by using & sliding motion. Temporarily secure them. Place the Guide Rail Brackets (08) on each end of the Top Guide Rail (03) by using a sliding motion. Temporarily secure them. Refer to Figures 2 for details.
STATIONARY GLASS 4. Rest the Stationary Glass {02) on the p Reinstalled threshold or shower base and push It up against the wall. NOTE: The Top Guide All (03) secured on the Stationary Glass should face the interior of the shower. Be sure the Top Guide All and Stationary Glass are aligned with the threshold or shower base and are fully leveled. Make adjustments to the Glass Bracket (07) If horizontal adjustments are necessary. Refer to Figure 3 for details.
GUIDE RAILS 5. Carefully make an outline on the wall of the Guide Rail Brackets (08) position. Set aside the Stationary Glass (02) while you disassemble the Guide Rail Brackets from the Top Guide Rail (03). Position the Rail Bracket into the outlined areas and precisely mark drilling holes. Refer to Figure 4 for details. 6. Use a @ 3/8" drill bit to dll the holes for the Guide All Brackets (08). Insert the “Large Anchor 3/8” (09). 7.
GUIDE RAILS Attach both female parts of the Guide Rail Brackets (08) to their male counterparts on the wall. Adjust the set screws on the Guide All Brackets until they are tight and fully secure the Top Guide Rail between the walls. Gently set the Guide Block (12) on the floor, parallel to the Stationary Glass Panel flush with the vertical edge of the glass.
ROLLERS 11. Affix the Rollers (04) to the Glass Panel (05). Hang the Rollers onto the Top Guide Rail (03) to suspend the door. Slide the lower edge of the Glass Panel into the groove found on the Guide Block (12). Make necessary adjustments to the fasteners to guarantee the lower edge of the Glass Panel does NOT touch the bottom of the Guide Block. Secure the door to the Top Guide Rail by mounting the two Roller Guards (20) on the door. 12. See Step 8 for details on cutting the Threshold Cover (14) to size.
ROLLERS 14. Add Kitchen and Bath silicone along the area where the Stationary Glass and Wall and the Threshold or Shower Base connect. Clean the silicone using the Silicone Cleaner (20) tool. WARNING: WAIT 24 HOURS BEFORE USING THE SHOWER ENCLOSURE TO ALLOW THE SILICONE GEL TO DRY COMPLETELY. Guarantee a longer life of the hardware finish by wiping off the metal parts with a soft cloth after each use. Avoid using abrasive cleaners and products especially those that contain bleach, clad, or ammonia.
MAINTENANCE Guarantee a longer life of the hardware finish by wiping off the metal parts with a soft cloth after each use. Avoid using abrasive cleaners and products especially those that contain bleach, acid, or ammonia. In the case that these chemicals are used, thoroughly rinse the surface as soon as possible and wipe dry with a soft cloth. Stainless-steel surfaces should be cleaned once a week or as needed. When applying a stainless-steel polish or cleaner, work with the grain and not against it.