Instructions / Assembly

Preparation
1. Determine location
- Determine the location for installation of RO faucet.
o You may use the existing predrilled hole on the sink. Make sure
the washer is big enough to cover the hole.
o If you drill a new hole on the countertop or sink, make sure that
drilling the hole will not damage any pipe or wiring underneath
the countertop or sink.
o Make sure the faucet base fits flat against the surface at the
selected location so the gasket will seal.
o the faucet stud will be accessible from below once the hole is
completed.
- Determine the location for the water storage tank.
o The pressure storage tank can stand up straight or lie down at
the desired location.
o Maximum distance between storage tank and the RO faucet is
15 feet. The system will produce a faster flow at the RO faucet
with shortest tubing from the tank to the RO faucet.
7
Installation
2. RO Faucet Installation (see image on page 8)
1) Slide Escutcheon chrome plate and large rubber gasket onto stem of
faucet and place faucet onto sink with stem going through the hole.
2) Place small rubber gasket, plastic washer, metal ss washer and star
lock washer over threaded stem of faucet and tighten locking nut
from under the counter surface to lock the faucet into place. DO NOT
OVER TIGHTEN.
3) Insert compression nut, plastic ferrule & tube insert into the blue
tubing as shown in image on next page. Now insert this end to the
faucet stud/stem hole from under the counter and tighten with
compression nut.
4) Connect the other end of blue tubing from the faucet to outlet of
inline post-carbon filter (5th stage) in 5-stage RO, and to the alkaline
cartridge (6th stage) in 6-stage RO. See image on page 5/6.