Installation Guide

6
Position Wall Section H
8. Position WALL SEC-
TION H
Position Wall Section H on
the left front side of the sauna
according to the guide on IL-
LUSTRATION 1. Using 2”
screws and pre-drilled holes,
fasten Wall Section I to Wall
Section H.
NOTE: As with step 6, be
sure the wall edges and top
edges align evenly.
9. Position DOOR SECTION
G
Position Door Section G be-
tween sections F & H.
10. Position DOOR SECTION G, Cont.
Connect Wall Sections H and F to Door Section G
by angle-screwing the wall sections with 2”
screws.
Position Door Section G
Completed Roof Support
11. Build ROOF SUPPORT
Assemble 4 roof support rails by angle-screwing
with 2” screws through the pre-drilled holes.
NOTE: Be sure that the rails are square and level
and that the screw head does not protrude into the
groove.