User's Manual

2-4
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Anchor specifications
Use the following table to determine the specific anchor to use, and the
hole size and depth required. Note that anchors for cabinets may be set
in the drilled hole before or after cabinet placement, whereas anchors
for mounting bases must be set before placement of the mounting base.
Table Note
* A EZBFo frame in Zone 4 requires a "Zone 4 kit" if a second add-on
module is added.
Application key
A = Modular Cell Cabinets/ WNG battery cabinets
B = EZBFo battery base module
C = Mounting bases
Key
Seismic
Zone(s)
Anchor Type Hole Size / Depth Anchor set before or
after unit placement?
A 0, 1, 2 (4) 1/2" drop in 5/8" (16-mm) bit / 2"
(50-mm) deep
Before or after
A 3, 4 (4) 12-mm expansion
stud (outdoor)
11/16" (18-mm) bit /
minimum 4" (100-mm) deep
Before or after
B 0, 1, 2 (4) 1/2" dia. drop in 5/8" bit / 2" (50 mm) deep Before
B 3, 4 * (8) 1/2" dia. drop in 5/8" bit / 2" (50 mm) deep Before
C 0, 1, 2 (4) 1/2" drop in 5/8" bit (16-mm) / 2"
(50-mm) deep
Before
C 3, 4 (4) 12-mm expansion
stud
11/16" (18-mm) bit /
minimum 4" (100-mm) deep
Before