Installation Instructions

SECTION5:INSTALLATIONINSTRUCTIONS
5.1 INSTRUCTIONSFORSTANDARDSEPTICTANKS
1
Dig and measure for appropriate tank.
Allow for an extra 6-12 inches of space
around the tank. Maximum depth of
bury is 24” from top of tank to nish
grade.
2
Dump 6-12 inches of gravel mixture
in the bottom of the hole and level.
3
Set tank in hole and move the tank back
and forth to settle tank in the gravel
mixture. Use 3/8” - 3/4” gravel type
aggregate.
4
Level tank before removing straps in case
further extraction is needed. Install riser
(if used) at this time.
14
12-11-081 Menards Training Manual.1-7-13.indd 14 1/9/2013 11:24:48 AM