INSTRUCTION MANUAL X AIR 10 www.aivituvin.
NOTICE Please retain these instructions for future reference. Firmly secure all bolts,screws and knobs before use. Reconfirm that all bolts,screws,and knobs are secure every 90 days. Fasten screws loosely during initial assembly. Do not fully tighten screws until the item is completely assembled. Do not use or store this item in the proximity of open flame or flammable/combustible chemicals. Be aware that some parts are heavy and have sharp edges. Be aware that moving parts can injure,crush and cut.
TOOLS REQUIRED PHILLIPS SCREWDRIVER DRILL (RECOMMENDED) 2PERSON ASSEMBLY APPROXIMATELY 45MIN. ASSEMBLY HARDWARE M3.5x40mm BOLT 18PCS+1spare M3.5x 0mm SCREW 4PCS+1spare P1 M3.
PARTS Front panel of hutch PC A Front panel of pen 1PC 1PC B C Left side panel of pen 1PC 1PC D 1PC Right panel of hutch Back panel of hutch 1PC E 2PCS 1PC 3
PARTS Lower tray PC Ramp 1PC 1PC Pen roof 1PC 1PC 2PCS Hutch roof 1PC Folding metal feeder 1PC PCS
PRODUCT ASSEMBLY 01 Attach Part A, Part B and Part C by 6pcs of P2 screws. X6 02 Attach Part G to Part A and Part B by 4pcs of P2 screws.
PRODUCT ASSEMBLY 03 Attach the pen Part D, Part E, Part F by 4pcs of P2 screws. X4 04 Attach the pen to hutch by 2pcs of P1 screws.
PRODUCT ASSEMBLY 0 Repeat on the other side. X2 0 Slide in the tray Part J.
PRODUCT ASSEMBLY 0 0 ① Put in 2pcs of Part H to be UPWARDS direction to seperate the urine & poop. ② Then slide in the tray Part I. ① Screw the feeder to Part C by 2pcs of P5 screws. ② Then put in the rabbit chewing toy P6.
PRODUCT ASSEMBLY 0 ① Screw the ramp Part M to the bar on the Part G by 4pcs of P4 screws. ② Screw 2pcs of eye hook P8 on the front door of pen. (The are pre-drilled holes to screw in) Then hang with the front ramp.{Use only when needed} X4 10 X2 Screw the roof hinge to the back by 3pcs of P4 screws on each side.
PRODUCT ASSEMBLY 11 Screw the roof hinge P7, one side to the roof by P4x2 the other side to the right panel by P4x2. X1 X4 12 ① Attach the pen roof Part K by 4pcs of P2 screws. ② Stick PVC curtain "P" to the hutch door.
PRODUCT ASSEMBLY 13 Screw two casters without brake Part Q to the front of hutch legs by P3x8. 3 X8 1 Screw two brake casters Part R to the back of hutch legs by P3x8.
HELP CENTER Question about your product? we're here to help contact us via service@aivituvin.com ? Product inquiry Orders FAQ Product Assembly Returns & Refunds THANK YOU Thanks for your support to Aivituvin. Your satisfaction is our #1 priority. Once the items are received, opened, and deemed to be faulty or other problems. Pls contact us at service@aivituvin.com for the solution. We will feedback to you within 24 hours.
WARNING Manufacturer and seller expressly disclaim any and all liability for personal injury,property damage or lo ss,whe ther direct ,indir ect,or incid ental ,resul ting f rom th e inc orrect attachment,improper use,inadequate miantenance,or neglect of this product.