User's Manual

AdvancedRFTechnologies,Inc.  55
7. COMMISSIONING
Thecommissioningprocessiscomposedofthefollowing:
PreCommissioningCheck(refertosection7.1)
OpticCommissioning(Opticlosscompensation)(refertosection7.2.1)
HEcommissioning(refertosection7.2.2)
RUcommissioning(refertosection0)
Commissioningverification(refertosection0)
7.1
PreCommissioningCheck
7.1.1 Verifycableconnections
Beforepoweringupunits,checkallRFcables,fibercables,andpowercablesconnections.
AllpowerLEDsshouldbelit1minuteafterthecomponentshavebeenturnedon.
CheckwhetherLD&PDLEDsofHEODUmodulesaresolid
GREEN.(PDLEDwillbelitgreenwhenconnectedto
aMasterRU).
If the PD LED for the link with a connection with to a HPR is OFF, then check the optic cable
connection.
IftheopticcableisgoodandthePDLEDis notlit
green,thetryanotheropticportontheADX
RACKODUtoseeiftheotherportlightsupgreen.
7.1.2 ConnecttotheWebGUI
ConfirmthattheNMSHost/RemoteswitchissettotheHostposition
ConfirmthattheHEView/RUViewswitchissettothe
HEViewposition
ConnecttheRJ45crossovercablefromtheEthernetportofNMStotheEthernetportoflaptop
Launch a standard Internet browser like IE or Google Chrome and type the System Controller’s IP address
(192.168.63.1)intotheaddessbar
Ontheloginscreen
usethefollowingdefaultlogin/passwordtogainaccess:
Username:adrf
Password:adrf
Figure71 Loginwindow