User's Manual

InterReach picoBTS Installation Guide Page 33
© 2008, ADC Telecommunications, Inc.
ADCP-77-061 • Issue A • 08/2008 • Chapter 3 - Commissioning and Configuration
3.4.4 TERMINATING SERIAL COMMUNICATIONS WITH THE PICOBTS
To terminate serial communications, use the disconnect menu within HyperTerminal or
other application.
3.5 PREPARING FOR ON-LINE COMMISSIONING
The following procedure is necessary to ensure that the picoBTS is ready for use and ready for
on-line testing.
1 Power on the picoBTS if it is not already on. Verify that all PWR and On-Line LEDs are
green.
2 Using the appropriate documentation, ensure the distributed antenna system (DAS) is
properly connected, cabled and configured.
3 Inform the OMC operator that the picoBTS is ready for network configuration.
4 After the OMC operator has configured the picoBTS, continue with on-line commis-
sioning tests in the next chapter.