User`s guide

3-30 Machine Maintenance Procedures
Power Board Removal 0
Prerequisite:
Upper Cover Removal
1. Locate power board (B) on upper cover. Refer to Figure 3-26.
2. Remove screw (A) from upper cover (Figure 3-28).
Figure 3-28. Power Board Removal
3. Remove power board FFC (B) from opening in upper cover mylar (C).
Power Board Installation 0
1. Install power board FFC (B) to opening in upper cover mylar (C) (Figure 3-28).
2. Install and secure screw (A) to upper cover.
3. Install upper cover.
Size Quantity Screw Type
M2.0x3.0 1
A
B
C
SG_JE50_HR.book Page 30 Thursday, December 23, 2010 3:47 PM