Ashe product style is continuously updated, the actual product may not match the illustration, but the basic principle is the same. After the installation is completed, this manual must be kept by the customer, Bathtub Installation Instructions (Acrylic) This bathtub manual must be given ta the user along with tha bathtub. “This warranty is only valid If installed by a professional installer following. the steps In the Instructions.
Precautions Before and After Installation 1. Please check the product for completeness and possible damage immediately after receiving 1. After unpacking, please confirm the parts and quantity the goods (see the parts list on page 02 for details). according to the following contents. 2. Inform your dealer immediately if any damage occurs, we are not responsible for any damage Product Side Drain Installation Bathtub PA . Incurred during or after Installation. Name Fittings Instructions 3.
1. 1.Bathtub installation preparation Please ensure a space 100mm larger than the product size of the bathtub, and determine the installation position of the bathtub. 1. 2.Bathtub installation Place the bathtub upside down on the upholstery as shown, and adjust the bathtub feet 2~3mm above the edge of the bathtub {make sure the weight-bearing is on the bathtub feet). 2p 1. 3. Connecting the drainage pipe Please connect the bathtub downer to the drain.
1. 5. Fix the bathtub Use silica gel to fix the base on the ground, and wait for it to cure for 24 hours before proceeding to other constructions. 1. 6. Cleanup After the installation, please clean the floor, and finally clean the bathtub with a rag dipped in a neutral detergent. Free maintenance policy 1. During the warranty period, if the user correctly follows the instructions of the installation manual and uses the products of the company, the company will repair the faulty products free of charge. 2.