Uniwave Installing and Populating Hubs
User Manual
Copyright © 2022 Zinwave. All rights reserved. 5-8
Note: If powered up with no modules installed the Primary Hub shows 4 green LEDs. If modules are
installed then the alarm warning and fault LEDs may show alarm conditions at initial start-up. This could
be due to the fact that no Remote Unit elements are connected. These alarms can be cleared via the
Primary Hub Set Up page of the Configuration GUI once the system is correctly configured.
Although modules may be hot swapped, during initial installation it is recommended that the Primary
Hub power is switched off until the initial module installation is completed.
5.6 Powering the Secondary Hub
The Secondary Hub has an IEC AC power socket in the front; the cord is country-specific.
CAUTION :
DOUBLE POLE/NEUTRAL FUSING
The Power Supply Module in the Secondary Hub 308-0004 has multiple sources and may include a
fuse in the Neutral AC connection. Disconnect the AC mains supply to de-energize the phase
conductors. After operation of the fuse, parts of the equipment that remain energized might represent
a hazard during servicing.
To Power on the Secondary Hub:
1. Plug the AC power cord into the front of the Secondary Hub and into an AC power outlet.
2. Verify the LED status shows correct start up sequence (Flashing red, flashing green, stable
green) and the equipment is ready for operation.