User's Manual

Uniwave Installing and Populating Hubs
User Manual
Copyright © 2022 Zinwave. All rights reserved. 5-2
5.1.2 Standard 19" (48.26cm) Rack Mounting
The Primary Hub is deigned to mount directly into a 19 inch rack framework with no additional mounting
materials.
The following tools are required for installation (Not provided):
4x M6 cage nuts appropriate for 19 inch rack frame
Pozi-drive screwdriver
Cage nut insertion/extraction tool
Note: If rack frame does not use M6 nuts, you must supply appropriate nuts to secure the Hub.
To install the Primary Hub in a rack:
12) Remove all parts from the Accessory Box included in the box with the Primary Hub.
13) Attach the mounting brackets (using the black countersunk screws 128-0118) to the side of
the Primary Hub so that the mounting face is flush with the front of the Hub.
14) Using the cage/nut insert/extraction tool, install 2 M6 cage nuts on each side of the rack.
The spacing must align with the holes in the Hub.
15) Place the Primary Hub into the rack and secure using screws 128-0112 and washers 128-
0113.
5.1.3 Open Frame Rack Mounting
The Primary Hub is designed to mount into an open frame rack with an offset of either 75mm or 125mm
(approx. 3 or 5 inches), using supplied mounting materials.
The following tools are required for installation (Not provided):
4x M6 cage nuts appropriate for 19 inch rack frame
Pozi-drive screwdriver
Washers and Screws, suitable for Rack type, to secure equipment