User's Manual

Uniwave Performing a Basic Installation
User Manual
Copyright © 2022 Zinwave. All rights reserved. 4-2
4 Performing a Basic Installation
The following procedure is intended to provide you with a basic work flow to get a new system up and
running. It provides references to specific instruction for that step.
To install Uniwave:
1) Unpack and verify all components (See section “Installing and Populating Hubs” ).
2) Rack mount Hubs and populate with the appropriate modules (See section “Installing and
Populating Hubs”).
3) Install Remote Units and antennas (See section “Installing Remote Units” and “Connecting
Antennas to Remote Units”).
4) Install power for Remote Units (local or PSU) (See section “Powering Remote Units”).
5) Make and check all connections for power and data between Primary, Secondary, and
Remote Units. This will be fiber for Optical Connections. (See section Fiber Patch Cords).
6) Ground any Rack Mounted Equipment.
7) Power on all equipment.
8) Watch LEDs for self-test and connection. (See section “Start-up Sequence”). Trouble shoot
connections on infrastructure cables using LEDs (see “Hub and Module LEDs”). Swap fibers
and check power as needed.
9) Connect the PC to the Primary Hub to configure system. (See section “Initial Standalone
Access”).
10) Access the GUI and view status pages (See section “Accessing the GUI”) and ensure
Primary Hub software is the latest version. Perform software upgrade if needed.
11) Set up the system based on the coverage tool and measured inputs. (See section “System
Setup”).