User's Manual

Copyright © 2022 Zinwave. All rights reserved. xii
When operating on a channel or channels under 47CFR parts 24 or as identified in the following table,
the 308-0007-1 and 308-0007-2 Remote Units are an Industrial Booster as per 47CFR part 20.
Rule
Part
Band
LTE band
Downlink
Frequency
Range (MHz)
Service
Modulation
Transmit
power
per port
(Watts)
Emissions
Designator
24
PCS
2
25
1930 - 1995
UMTS
QPSK
0.25
F9W
W9W
HSPA/HSPA+
16-QAM/64-
QAM
FDD LTE
(band 2/25)
QPSK + QAM
CDMA
QPSK
CDMA2000
Ev-DO
8PSK, 16-QAM
27
AWS-1
AWS-3
4
66
2110 - 2180
UMTS
QPSK
0.25
HSPA/HSPA+
16-QAM/64-
QAM
FD-LTE
(band 4)
16-QAM/64-
QAM
FD-LTE
(band 10)
16-QAM/64-
QAM
BRS/EBS
7
2496 2690
LTE
16-QAM/64-
QAM
0.25
FCC Cautionary Note
Any changes or modifications in construction of this equipment which are not expressly approved by
the party responsible for compliance could void the user's authority to operate the equipment.
FCC Verification: Primary and Secondary Hub
These devices comply with part 15 of the FCC Rules. Operation is subject to the following two
conditions: (1) this device may not cause harmful interference, (2) this device must accept any
interference received, including interference that may cause undesired operation.