Instructions / Assembly

FREESTANDING INSTALLATION
Note: If you purchased a brushed nickel trim kit, it must be installed before
installing the bathtub (brushed nickel trim not available on all models).
Warning: Due to the rough handling during shipping or on the job site, do
not install this product until a thorough inspection and water test has been
completed.
Check bathtub for correct model and size. Carefully inspect the tub for any
damage (i.e. chips, scratches, cracks). If at any point during the
pre-installation inspection and water test, you discover a problem with the
bathtub or piping system, do not install the unit and contact us immediately.
All pre-installed parts must be checked and tightened before installation.
INSTALL BATHTUB
1. Clean, level, and prepare the floor for installation.
2. Determine the location of the drain pipe on the floor by taking
measurements of the drain and waste location beneath the unit.
3. Place the bathtub in the designated space ensuring that the drain
and waste locations match with that of the tub and adjust the
balancing feet as needed, using a level.
(figure 1)
- 1 -

Summary of content (2 pages)