Insert wooden dowel (A) into parts (7,8,9,10) as per diagram.
Using bolt (E) connect and secure both parts (6) with Nut (F) and Wrench (Q) as per diagram. Note : Do not fully tighten all the bolts .
Using bolt (B) attach part (3) to parts (4,5) ,then using bolt (H) attach bracket (M) into part (3) with hex key (N) as per diagram.
Secure feet (P) at the bottom of parts (1,2) as per diagram.
Using bolt (C) attach parts (1,2) to part (3) with hex key (N) as per diagram.
Using screw (D) attach part (5) to part (10) ,bolt (B) attach part (10) to part (1) with hex key (N) as per diagram.
Using screw (D) attach part (10) to part (8) ,bolt (B) attach part (8) to part (2) with hex key (N) as per diagram.
Insert part (9) into part (8) ,then using screw (D) attach part (8) to part (9) ,bolt (B) attach part (9) to part (1) with hex key (N) as per diagram.
Insert part (8) into part (9) ,then using screw (D) attach part (9) to part (8) ,bolt (B) attach part (8) to part (2) with hex key (N) as per diagram.
Insert part (9) into part (8) ,then using screw (D) attach part (8) to part (9) ,bolt (B) attach part (9) to part (1) with hex key (N) as per diagram.
Insert part (8) into part (9) ,then using screw (D) attach part (9) to part (8) ,bolt (B) attach part (8) to part (2) with hex key (N) as per diagram.
Insert part (7) into part (8) ,then using screw (D) attach part (8) to part (7) with hex key (N) as per diagram.
using screw (D) attach part (4) to part (7) with hex key (N) as per diagram.
Using bolt (C) attach parts (1,2) to part (3) with hex key (N) as per diagram. Note:Fully tighten all bolts.
Using screw (G) attach parts (6,11) into parts (1,2) with Philips head screwdriver as per diagram.
If necessary, adjust the pre-attached Floor Levelers at the bottom of metal legs to level the unit.
Using screw (K) attach Flat washer (L) to bracket (M) to Wall anchor (J) to wall with Philips head screwdriver as per diagram.