Installation Guide

Installation Support •(800) 875-5285 • www.WarmlyYours.com
INSTALLATION INSTRUCTIONS
SURFACE PREPARATION
Surface must be structurally sound, clean, dry, and free from dirt, oil sealers or any contaminants that would prevent a good bond.
CeraZorb must acclimatize in their sealed packaging for 48 hours at a temperature of 65ºF (18ºC).
CONCRETE SLAB
Inspect concrete sub oor for any open cracks and ll with a high-grade patch. Remove any excess concrete lumps or residue that
may interfere with the installation of CeraZorb. The concrete slab should be fully cured, dry, smooth, at, and accept water penetration.
Concrete must be free of eforescence and not subject to hydrostatic pressure. A good quality concrete waterproof sealer may be
required if moisture in the slab is above 10 percent.
GYPSUM SUBSTRATES
Gypsum substrates must have a PSI greater than 2000 and must rst be primed or sealed per manufacturer’s instructions.
WOOD SUBSTRATES
The sub oor should be permanently dry, smooth, at, and clean – free from dirt, grease, wax, paint, oil, or anything that would hinder a
good bond. Plywood sub ooring should be of a good grade. Variations in oor level over 1/8” within a 3-ft. span should be leveled before
installing underlayment. Any nails or other protrusions should be pounded at or removed. Sub oor should have L360 for deection.
THERMAL INSULATING & SOUND CONTROL UNDERLAYMENT
GROUT
CERAMIC TILE
CERAZORB
TEMPZONE™
FLOOR HEATING SYSTEM
POLYMER-MODIFIED
THIN SET MORTER
MAPEI ULTRACONTACT® or ULTRACONTACT RS
or equivalent BOND COAT ADHESIVE
®

Summary of content (2 pages)