www.veikous.com customerservice@veikous.
1 2 7A 2 2 2 7-1 4 2A 2 8 2 2-1 6 9 2 3 2 12 1 4 2 13 1 5A 2 14 1 5B 2 15 1 6 2 16 12 7 2 17 8
18A 2 24 2 18B 2 25 2 19 8 26 2 20 1 27 4 22 2 28 2 23 2 30 2 23A 1 31 4 23-1 2 31A 2
32 4 35A 33A 2 35B 33B 2 37 34 2 2 2 8 60 10 30 84 15 46 22 H 2 10 18 M3 30 16
A I J B K C D 2 E F 1 4
A B A B A B A B A C D C C D C E F E B A B A B A J J A B I E E C C C C K K K K A B A B A B A B A
23 7 6 22 8 23A 20 17 9 19 5B 7A 23 14 24 9 8 2 18B 18A 2A 19 12 15 5A 6 20 4 7A 3 16 5A 7 19 1 1 16 5B 13 2A 3 2 4 34 33B 34 33A 33A 32 33B 32 32
Step 1: Base Frame Assembly 1 2-1 45 2A 45 2-1 2 45 45 4 2-1 3 45 45 1 1 2 2 2 2A 2 3 2 4 2 2-1 3 45 24 45 2A 45 2 4 3 X2 32 Step 2: Pre-Assembled Base Frame Installation 4 2 3 2A 32 1 1 2A 32 2 3 4 32 4 42 8 42 32 1 32 4 1 42 32 4
Step3-1: Back Wall Frame Assembly 5A 1 5B 1 42 2 4 5B 32 4 42 5B 32 5A 5A 3 5B 32 5A 42 32 3 3 4
Step3-2: Back Wall Frame Assembly 14 15 5A 14 4 14 5B 4 14 15 42 42 Step3-3: Back Wall Assembly 19 C C C 19 C 3 4 C 4 19 4
Step3-4: Back Wall Frame Assembly 42 5A 19 15 42 5A 19 C 42 19 C 42 14 42 42 19 C 42 42 5B 19 C 3 42 4 8 Step3-5: Back Wall Assembly F 19 13 F E 42 19 D E 22 D C C D C D 3 E 2 F 1 22 2 42 4 22 C
Step3-6: Back Wall’s Plastic Parts and Gable Frame Assembly 42 8 42 9 8 9 34 33A 33B 8 42 9 42 5A 5B 19 5A 8 1 9 1 34 1 33A 1 33B 1 42 6 19 22 14 15 22 19 5B 19 3 4 Step3-7: Back Wall’s Plastic Parts and Gable Frame Assembly 9 8 42 8 15 42 2 3 42 9 4 14
Step4-1: Front Wall Frame Assembly 5A 4 5B 5B 42 32 4 42 5B 32 5A 5A 5B 3 32 5A 42 32 3 3 4
Step4-2: Front Wall Frame Assembly 12 12 5A 13 4 12 5B 4 3 12 1 13 1 42 2 4 42 Step4-3: Front Wall Assembly 19 C C C 19 C 3 4 C 4 19 4
Step4-4: Front Wall Frame Assembly 42 5A 19 12 42 5A 19 C 42 19 C 42 13 42 42 19 C 42 19 C 3 42 4 8 Step4-5: Front Wall Assembly E E C C C C 3 E 2 4 42 5B 42
Step4-6: Front Wall’s Plastic Parts and Gable Frame Assembly 42 42 8 8 42 8 9 33A 42 33B 34 8 42 9 42 5A 5B 33A 8 1 9 1 20 1 33A 1 33B 1 34 1 42 6 I 1 5A 20 E E 19 C 12 19 13 19 C C 19 33B 5B C 3 4 Step4-7: Front Wall’s Plastic Parts and Gable Frame Assembly 9 8 9 8 42 42 12 42 42 I E 5A E 20 19 19 C C 12 13 19 19 C 3 42 4 C 4 5B 13
Step5-1: Side Roof Ridge Assembly 6 7-1 7A 7-1 7 44 44 6 7A 44 7 44 6 7 X2 7A 7-1 1 44 16 Step5-2: Pre-Assembled Side Roof Ridge Installation 33B 7 7A 7 6 2 6 2A 42 7A 1 7 1 7 2A 2 42 4
Step6-1: Middle Roof Ridge Assembly 23-1 23 42 23A 23-1 42 23 23 23 42 23A 23-1 2 42 8 42 23 23A Step6-2: Middle Roof Ridge Assembly 23 30 23A 23 30 30 2 Step6-3: Pre-Assembled Middle Roof Ridge Installation & Window Assembly Note: Windows must be slid into the Gutter of Frame 23 before assemble Frame 23.
Step7-1: Side Wall Assembly A A A A A A 4 Step7-2: Side Wall Frame Assembly 16 16 16 16 16 16 A 16 A 41X(2) 16 16 12 41 24 16 16 16 16 16 16 16
Step7-3: Side Wall Assembly A A A A A A A A A A A 10 B Step8-1: Roof Wall Assembly B B B B 4
Step8-2: Roof Wall Frame Assembly 17 NOTE: Put another 2 Screws(41) in this 4 tubes for next move 17 17 24 41 18A 18B 17 24 18A 17 18B 18A 17 17 17 8 18A 2 18B 2 24 2 H 2 41 24 42 4 24 42 17 8 T-Shaped screws are supposed to be placed in advance on the 2 No.18B and 2 No.17 Tubes. Refer to the Arrow for the Specific Place.
Step8-4: Roof Wall Assembly B J B B B J B B B B B 8 J 2 Step9: Side Wall’s Plastic Parts and Gutter Assembly 42 42 35B 42 31 31 6 43 42 42 31A 42 42 31 35A 35A 43 31 4 31A 2 35A 2 35B 2 42 12 43 8 42 42 35B 43 42 31 42 31A 42 31 42 43
46 Step10: Door Assembly 27 46 46 46 37 27 46 K 25 26 26 25 28 28 46 46 46 46 K K 46 46 26 46 27 46 28 K 37 46 20 46 46 K 25 46 37 27 37 46 46 27 3746 46