Keystone Method:
for Battery Closed-Loop Comm Cable
Introduction
This describes the steps to modify a standard ethernet cable and with a new connector to build a
closed loop communication cable between Fortress battery and inverter. This is required by the
battery to inverter connector cross wiring. Please refer to the unique cross wiring for each
specific inverter as described in the Inverter Integration Guide.
NOTE: The new connector is placed on the inverter side of the cable.
Making a Battery to Inverter com cable
The following photos show the steps to build a Fortress eVault to Sol-Ark RS485 modbus cable.
Step 1:
Cut cable and trim wires
leaving the three Fortress Power com wires:
eVault - green, white/green, white/blue
eFlex – green, white/brown, brown
Step 2 & 3:
- Slide on connector and wire guide
- Position wires in their respective positions in the wire guide (make sure they are straight
across) Carefully trim wires excess wires flush
Rev 1.0 - 09-23-21