Install Diagram

Designed by:Contractor:Job Name:
This is only a concept drawing, it is not intended to describe a complete system. The sole purpose of this drawing is to present our customers with a system layout that will describe some mechanical and electrical system requirements to suit the application needs. Generally it is used for
discussion purposes only. The qualified installer will determine the necessary components for and configuration of the system being installed, including additional equipment, isolation relays (for loads greater than the control’s specified output ratings) and any safety devices to ensure
compliance with national and/or local building and safety code requirements.
RRMT.B.D. SCALE: Revision: 0
Drawing:
Location: Drawn by: N.T.S.XXX
Date:
Page:
Triangle Tube, One Triangle Lane, Blackwood, NJ 08012 Tel: 856-228-8881 – Fax: 856-228-3584 E-Mail: info@triangletube.com – Web: http://www.triangletube.com
CCME 3r4.8 rev
02/20/13
of 2
T.B.D. T.B.D.
ET1
1
Challenger w/ r4.8
Software Revision
SC1
P G
Suitable Make-up Assy.
To Heating
Zones
T G
T G
AB B
Neutralize as
required
BC1
P T
From Heating
Zones
ODS
Suitable
Floor Drain
T G
Smart Tank
DHW1
ET2
On Combi units, when not
using the DHW tubes as
depicted, leave them
open/uncapped.
Z.V.
Z.V.
Z.V.
RC1
DC1

Summary of content (2 pages)