Installation Guide

INSTRUCTIONS
STEP 1
»
Clean the joist
surface making
sure it is dry and
free of any debris.
STEP 2
»
Cut the membrane
to the desired length
and remove tape
backing.
STEP 3
»
Apply tape to any
surface that can
hold water: all joists,
rim joists, beams
and ledger board.
TREX JOIST & BEAM TAPE INSTALLATION
PREPARATION
» Trex Protect Joist & Beam Tape
can be applied to horizontal
and vertical surfaces.
» Trex Protect Tape has two widths
making it convenient to apply to
double beams and joists. Use
1–5/8” (4.13 cm) Joist Tape for
joists and 3–1/8” (7.94 cm)
Beam Tape on all double beams.
» For best results, the Trex Protect
Tape should be installed when
temperatures are 50˚F (10˚C)
or greater.
»
If installing in cold weather or
when joists are wet, staple Trex
Protect to hold it in place while
attaching the deck boards.
The tape will seal when the
product warms above 40˚F
(4.5˚C).
» When pulling deck boards onto the
deck, a piece of plywood or wafer
board can be used to overhang the
edge of the deck. This will prevent
the product from rolling up and
pulling up from the joist.
JOIST & BEAM TAPE
For more information, visit trexprotect.com or call 1-877-348-1385
© 2019 Trex Company, Inc. All rights reserved. Trex
®
Protect
is manufactured and/or distributed by Dri-Deck Enterprises,
LLC. Trex
®
is a trademark of, and is used by Dri-Deck Enterprises, LLC. under a license with, Trex Company, Inc.
NOTE:
Trex Protect cannot be used when installing Trex RainEscape.