ASSEMBLY INSTRUCTIONS METAL GARDEN SHED E-mail: hofficeservice@gmail.com Metal Garden House Installation Tutorial https://youtu.
SITE PREPARATION Level the ground surface. ent cem Recommendation: Construct a wooden or concrete base as a foundation. The external dimensions of the product : 76.2’’ 71.5’’ 89.
BEFORE STARTING ASSEMBLY Remove all of the pieces from the 2 packages and spread them out on the ground. Before installation, please check the type and quantity of parts first. It is recommended to use a clean work surface to spread the parts out and for pre-assembly steps. Review all instructions before you begin, continue to refer to instructions during assembly. Be sure to follow all steps thoroughly. Please prepare these components in advance at the beginning of each stage.
ROOF PARTS A3 X2 A4 X2 C4R X2 C4L X2 C5 X4 GC X4 GE X2 M2 X4 M2L X4 M9 X2 M10 X2 M11 X4 M13 X2 PE3 X2 PE4 X4 PE5 X2 PE6 X2 04
WALL PARTS W1A X12 WS2A X4 WS3A X2 ULA X1 C2 X4 BE1 X1 GS X2 BE2 X1 GR X2 UE1 X1 V1 X50 UE2 X1 UR1 X1 V2 X309 BS3L X2 BE1L X1 BE2L X1 BS3 X2 UE1L X1 UE2R X1 US3 X4 05
DOOR PARTS DLA X1 20 X4 DC X2 DG X1 DH X4 DF X1 DRA X1 DX2 X4 SCREW cm 1 inch 2 0.5 3 1 1 inch M4*10 2 3 0.5 cm For GC inch 1 F5(X4) inch 3 1 0.5 1 3 1 0.5 4 1.5 M4*16 06 4 1.5 M4*10 2 F4(X5) M5*12 2 0.5 cm 1.5 F3(X32) 2 F2(X44) 4 1 1 inch 1.5 F1(X343) cm cm 4 3 1 4 1.
GE M10 GC M9 M13 M11 GC M11 M13 M11 GE M9 GC M11 M10 GC PE6 PE5 PE4 PE4 PE3 PE3 PE4 PE4 PE5 A4 PE6 C4R C5 M2L M2L A3 C5 C4L M2 M2 M2 M2 M2L M2L C4L C5 A3 C4R C5 A4 C2 UE2 US3 GS C2 UE2R GR US3 US3 GR UE1L C2 GS US3 UE1 C2 W1A W1A WS2A W1A W1A W1A W1A WS2A W1A W1A W1A W1A 20 20 DLA ULA WS2A DRA DF W1A UR1 DG WS3A WS3A 20 WS2A 20 BS3L BE2 BE2L BS3 BS3 BE1L BE1 BS3L 07 W1A
CONTENTS Bottom frame construction 09-12 (page) Wall construction 13-24 (page) Roof Mount 25-33 (page) Door installation 34-41 (page) 08
STEP 1 F1 BE1 BE1 F1 BE1L BE1 BE1L BE1L BE1 F1 X2 STEP 2 BE2 F1 BE2L BE2L F1 BE2L BE2 BE2 BE2 09 BE2L F1 X2
STEP 3 F1 BS3 BS3L BS3 BS3 BS3L BS3L BS3 F1 X2 STEP 4 BS3 BS3 F1 BE1L BE1L BS3L BE1 BS3 BE1L 10 F1 X2
STEP 5 BE2 BE2L BS3L BE2 BS3L BE1 BS3 BE1L BE2 BS3L F1 X2 STEP 6 F1 BS3 BS3 BS3L BS3 BS3L BS3L BS3 F1 X2 11
STEP 7 F1 BE2L BE2L BS3 BS3 BE2L BS3 BS3L BE1 F1 X2 STEP 8 F1 BS3L BE2L BS3 BE1 BS3L BE1 BS3L BE1 F1 X2 12
STEP 9 F1 Tips: Align the gasket with the hole, and then use the electric drill to drill the V2 into the hole. V2 STEP 10 Please align the screws with the screw holes for installation.
STEP 11 WS2A WS2A WS2A V2 F1 BE1 BE1L F1 X4 V2 X4 STEP 12 WS2A F1 V2 BE1 BE1L F1 X4 14 V2 X4
STEP 13 WS2A F1 V2 BE1 BE1L F1 X4 V2 X4 STEP 14 UE1L C2 UE1L GS UE1 GS UE1 C2 UE1 C2 UE1 C2 15
STEP 15 × √ Note: Connector must fit. STEP 16 Pay attention to distinguishing the direction when installing.
STEP 17 UE2R C2 C2 UE2 GS C2 UE2R C2 UE2 UE2 GS STEP 18 F1 V2 x2 BE1L BE1 F1 X6 17 V2 X6
STEP 19 US3 GR Insert Insert US3 x2 STEP 20 V2 Tips: Insert US3 into C2.
STEP 21 Note: Insert US3 into C2 US3 F1 V2 V2 BE1 F1 US3 BE1L F1 X2 V2 X2 STEP 22 V2 F1 W1A W1A W1A W1A BE1 BE1L F1 F1 X32 V2 X32 19
STEP 23 W1A W1A W1A W1A BE1 BE1L STEP 24 F1 W1A W1A W1A W1A V2 F1 BE1 BE1L F1 X32 V2 X32 20
STEP 25 W1A W1A W1A W1A BE1 BE1L STEP 26 F1 F1 V2 W1A W1A W1A W1A W1A W1A W1A BE1 BE1L F1 X32 V2 X32 21
STEP 27 W1A W1A W1A W1A BE1 BE1L STEP 28 F1 F1 V2 WS3A WS3A WS3A BE1 BE1 F1 X4 22 V2 X4
STEP 29 WS3A WS3A BE1 STEP 30 F1 UR1 WS3A ULA UR1 ULA Tips: Insert ULA and UR1 between the top beam and bottom frame respectively, and then push them to the corresponding position.
STEP 31 F1 V2 ULA ULA ULA V2 F1 F1 X4 V2 X2 STEP 32 V2 F1 UR1 UR1 UR1 V2 F1 F1 X4 24 V2 X2
STEP 33 F2 BE1L x2 C5 C5 F2 A3 V2 A4 C4L F2 C4R C5 F2 X12 V2 X4 STEP 34 F1 V2 F1 V2 M2L F1 X20 V2 X20 25
STEP 35 BE1 M2 M2L M2L Note: M2L is pressed into M2. M2 STEP 36 75.7 0° M2 M2L M2 M2L F2 M2L M2 M2 Note: DoM2L not tighten F2 yet.
STEP 37 M2 M2L STEP 38 M2 M2L F2 Note: Finally tighten all F2.
STEP 39 M2L F2 M2 x2 F2 X8 STEP 40 M2L F2 C4R M2L C4R x2 F2 X4 28
STEP 41 F2 C4L M2 x2 F2 X4 STEP 42 Note: Do not install F1 and V2 in the holes near the outer side of PE5.
STEP 43 F1 Note: Do not install F1 and V2 in the holes near the outer side of PE6. 6EP PE6 PE4 PE3 PE4 PE6 PE5 PE4 PE3 PE4 F1 X45 V2 X45 STEP 44 PE6 Note: Do not install F1 and V2 in the holes near the outer side of PE6.
STEP 45 F1 Note: Do not install F1 and V2 in the holes near the outer side of PE5.
STEP 47 F1 V2 M13 M13 M13 M13 F1 X3 V2 X3 STEP 48 GE F1 GE GE M10 x2 F1 X6 32
STEP 49 M11 M11 F1 M11 V2 M11 M11 M11 x2 F1 X2 V2 X2 STEP 50 F5 GC M10 M11 x4 F5 X4 33
STEP 51 20 DC DX2 DF DLA DX2 DC 20 STEP 52 20 20 DX2 DLA Note: Make clear the front and back of the door panel.
STEP 53 V2 F1 outside inside outside DF F4 F1 X8 35 V2 X8 F4 X2
STEP 54 V2 F1 F1 DH DX2 DLA F1 DX2 DH F1 F1 F3 X2 F1 X6 36 V2 X6 F3 X8
STEP 55 DC DC DC F1 DC F1 X8 37
STEP 56 20 DX2 DG DRA DX2 20 38
STEP 57 20 20 DRA DX2 Note: Make clear the front and back of the door panel.
STEP 59 20 F1 DH F3 DX2 F1 X2 DRA DX2 DH de 20 F1 X6 40 V2 X6 F3 X8
STEP 60 DRA DLA UR1 F3 DRA X4 F3 X16 41
STEP 61 V1 V2 F1 Metal Garden She Put it on the screw tip to prevent injury. ASSEMBLY INSTRUCTIONS FINISH Requires two people and takes 42 2-3 hours for Installa�on.
CARE & SAFETY • Unsuitable for storage of flammable or corrosive substances. • It is of utmost importance to assemble all of the parts according to the directions. Do not skip any step. • Please consult your local authorities if any permits are required to erect shed. • Periodically check shed to assure that it remains stable and that the site remains level.