Installation Instructions

FormNo.3441-170RevA
RollerRebuildToolKit
Greensmaster
®
CuttingUnits
ModelNo.140-5553
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
Preparethemachine.
Bearing/outer-sealtool
1
2
Assemblywasher1
Rebuildtheroller.
TheRollerRebuildT oolKitisusedinconjunctionwith
theRollerRebuildKit(Part140-5552),whichincludes
newbearings,bearingnuts,outerseals,andV-rings
forrebuildingagreensroller.
1
PreparingtheMachine
NoPartsRequired
Procedure
1.Parkthemachineonalevelsurface.
2.Engagetheparkingbrake.
3.Lowerthecuttingunits(ifapplicable).
4.Shutoffthemachineandremovethekey(if
applicable).
2
RebuildingtheRoller
Partsneededforthisprocedure:
1
Bearing/outer-sealtool
1Assemblywasher
DisassemblingtheRoller
1.Removetherollerfromthecuttingunit.
2.Removethebearinglocknuts,seals,rollershaft,
andbearingsfromtherollertube(Figure1).
©2020—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3441-170*

Summary of content (4 pages)