Daily Checklist

E:\TECHTR\MACHINES\M20\M20 ENGLISH OpCk.doc
T17
Before Operation - Checklist
Before cleaning with your machine there are a few pre-operational checks to perform to
confirm your machine is ready for use.
Check the battery fluid level and fill, if required.
Check the battery charge level and charge the battery, if required.
Check the headlights, taillights and safety lights.
Check the safety alarms.
Check the condition of the main brushes.
Remove any string, banding, plastic wrap, or other debris wrapped around the brushes.
Check the main brush compartment right hand squeegee for damage and wear.
Check the optional right side scrubbing brush for damage or wear.
Remove any string, banding, plastic wrap, or other debris wrapped around the brush.
Check the optional right side sweeping brush for damage or wear.
Remove any string, banding, plastic wrap, or other debris wrapped around the brush.
Check the condition of the right side brush skirt or squeegee.
Check the solution tank cover seal for damage and wear.
Check the recovery tank cover seal for damage and wear.
Confirm the vacuum fan filter is clean.
Confirm the optional ES filter is clean.
Check the vacuum hose for debris or blockage.
Check the squeegees for damage and wear.
Check the
Check the optional SE (Seveir Environment) / ES detergent concentrate level and fill as
needed.
Check the main brush compartment left hand squeegee for damage and wear.
Check the optional left side scrubbing brush for damage or wear.
Remove any string, banding, plastic wrap, or other debris wrapped around the brush.
Confirm the recovery tank is drained and clean
If using the optional ec-H2O solution system.
Ensure all conventional cleaning agents are drained and rinsed from the solution tank.
NOTE: When ec-H2O Scrubbing: Ensure the solution tank is filled with clear cool water
only.
Check the steering and brakes for proper operation.
Check the service records to determine maintenance requirements.
List issues identified during this inspection or that occurred during machine operation.
___________________________________________________________________________________
___________________________________________________________________________________
OPERATOR ____________________________ DATE _____________________________
SUPERVISOR ___________________________ DATE ____________________________

Summary of content (1 pages)