Arad Technologies LTD. Confidential Allegro Wall Mount unit Instructions Version 1.
Arad Technologies LTD. Confidential 1. Background The Allegro Wall Mount unit is now at validation phase. It was agreed that in order to shorten the validation cycle, MM will get R&D samples for testing. 2. Document scope This document presents the issues that can be tested by MM. 3. Installation • Step 1 – Wall mount spacer assembly o Put a t-wrap in the spacer, the t-wrap is needed for tightening the communication cable to the spacer, so in case the cable is pulled it will not be cut out from the unit.
Arad Technologies LTD. Confidential • Step 2 - Wall mount unit attaching: o Tighten the cable to the wall mount spacer with the t-wrap. o Attach the wall mount unit to the wall mount spacer by the aid of the guiding pins and 2 screws (supplied).
Arad Technologies LTD.
Arad Technologies LTD. Confidential 4. Unit operation by means of Tech tool • The unit is opened to communication with tech tool, however it is closed to communication with base station. • At this phase, the communication between the wall mount unit and various encoders can be checked. • Test can be done as following – o Connect the desired encoder to the communication cable. o Get the reads by the tech. tool. 5. RF Tests • Unit can be checked in RF chamber: o Send command to the unit (e.g.
Arad Technologies LTD. Confidential Compliance with FCC Regulations CAUTION The User and the Installer should be aware that changes and modifications to the equipment not expressly approved by Master Meter could void warranty and the user's authority to operate the equipment. Professionally trained personnel should install the equipment. ATTENTION The digital portion of the transceiver has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.