USE & CARE GUIDE TIERING BOWLS FOUNTAIN WITH LED LIGHT # 201601PT PLEASE CALL CUSTOMER SERVICE 1-800-935-3959 support@teamson.
PARTS A 1x Fountain Top B 1x C Funtain Base 3x Mesh D Pump/YH-LV110T TOOLS REQUIRED FOR ASSEMBLY • No tools required ASSEMBLY INSTRUCTION NOTE: The diagrams shown are for illustrative purposes only and are not to scale 2 1x E
ASSEMBLY INSTRUCTIONS 1. 2. 3. Unpack the contents of the box and check to make sure that all items are accounted for and in good condition. Select a flat, level surface for the assembly and final location of your fountain. Place the fountain base on a flat, level surface. Lead the water tube out of fountain top. Align and attach the connector on the base of the fountain top with the connector on the top of fountain basin to lock.
1. Distilled water is always recommended to fill your fountain. Distilled water is pure and should have no minerals or sediment in it. It will extend the life of the pump and the time between cleanings. If distilled water is not an option, use filtered water, as water directly from your tap will generally have minerals and chemicals that can build up and leave behind residue on your fountain. 2. Check the water level regularly to ensure the pump is completely submerged during operation.
If the water flow is uneven… 1. Gently sweep across the water surface to achieve even water flow across the face of the fountain. 2. Check the top of the basin to ensure it is level. If not, shim the basin from the bottom until the top spillway is level or has achieved even water flow all around. SAVE THESE INSTRUCTIONS! This manual contains important safety and operating instructions Each Peaktop product may have variations in texture, finish and appearance from one unit to the next.