Wiring Guide

SUPERSEDES: New Plant ID #9300-4104 EFFECTIVE: February 17, 2021
For information on Taco’s Zone Valve Controls (ZVC’s)
including catalog sheet, instruction sheets, Visio stencils
and our highly praised Zone Controls Wiring Guide, scan the QR code to the left or go
to our website:
www.TacoComfort.com.
Overview:
The ZVC406-5 is a six zone valve control that can have up to 6 thermostats
connected and will operate up to 6 zone valves, plus 3 auxiliary outputs (AUX) to
control circulators; like boiler and primary loops.
The ZVC406-5 has a priority zone option, allowing zone 1 to operate and deactivate
zones 2 through 6 during a priority call; this is ideal for when using an indirect water
heater.
The ZVC406-5 includes timing options for Post Purge, Pump Exercise and Priority
Protection. The ZVC406-5 includes an energy saving program that can adjust the
temperature of a modulating-condensing boiler or conventual On/Off boiler to
increase the comfort level and use less fuel, without the need to install an outdoor
sensor.
Table of Contents
1. Warnings & Safety Information
2. Location & Installation
3. Operation & Dip Switch Settings
4. Wiring Procedure
5. Product & Applications Diagrams
6. Reset Control Setup & Wiring
7. The Taco eLink Mobile App
8. Troubleshooting & FAQ’s
9. Inner Cover Removal & Fuses
10. Specifications
11. Accessories & Replacement Parts
12. Warranty
ZVC406-5 Zone Valve Control
102-575

Summary of content (16 pages)