User's Manual

40 6390-009-001 REV B www.stryker.com
Return To Table of Contents
User Setup Procedures
POWER-LOAD SETUP
The condition of Power-LOAD is the responsibility of the user. It is important that Power-LOAD is working properly
before the product is placed into service. Have a qualified service person use the following list and the operation guide
instructions to check Power-LOAD functionality before the product is placed into service.
1. Raise the lifting arms and manually push the Power-LOAD trolley into the head end of the transfer assembly to
charge the battery. The batteries require approximately 2 hours to recharge before Power-LOAD is put into
service for its first use.
Note: The battery power LED flashes green when charging.
2. Confirm that the installation checklist is complete (see “Power-LOAD Installation Checklist” on
page 38).
3. If the installation checklist was completed by a third-party installer, the installation checklist should be repeated by
the end user. Do not place Power-LOAD into service if the installation checklist cannot be completed.
POWER-LOAD COMPATIBLE COT SETUP
The condition of the Power-LOAD compatible cot is the responsibility of the user. It is important that the Power-LOAD
compatible cot is working properly before the product is placed into service. Ensure that the cot is setup according to
the requirements specified in the appropriate cot operations/maintenance manual for your cot model.
WARNING
To avoid the risk of patient injury, adjust the cot height to match the vehicle deck height as described in the appropriate
cot operations/maintenance manual for your cot model.

Summary of content (20 pages)